gsk logo (1)

Widening, Improvement & BTR from Toor Nazon to Stara Kada via Kisa Khail & Road from Ghaki to Vatakai Kurram

Clients:
C&W
Scope of Services:
F, S, D,Q, C
Scope of work:
Construction of 5.5 km road
Timeframe:
Inprogress
Location:
Lower Kurram

Widening, Improvement & BTR from Toor Nazon to Stara Kada via Kisa Khail & Road from Ghaki to Vatakai – Lower Kurram

The Widening, Improvement & Blacktop Road (BTR) Project from Toor Nazon to Stara Kada via Kisa Khail and Road from Ghaki to Vatakai is a key infrastructure development initiative in Lower Kurram, undertaken by C&W (Communication & Works Department). This project focuses on the construction and enhancement of a 5 km road, ensuring improved connectivity, safety, and economic growth in the region.

Project Overview

  • Project Location: Lower Kurram
  • Executing Agency: C&W Department
  • Project Start Date: June 20, 2022
  • Current Status: In Progress
  • Total Project Cost: 515.69 million PKR
  • Consultancy Budget: 9.6 million PKR
  • Firm Type: Single Firm

Scope of Work

The project involves the upgradation, widening, and blacktopping of a 5 km road, ensuring a smooth and efficient transportation network. Key project activities include:

  • Feasibility Study (F): Conducting technical and economic viability assessments.
  • Surveying (S): Performing topographic and geotechnical surveys for proper alignment.
  • Designing (D): Preparing structural road designs to withstand heavy traffic loads.
  • Quality Assurance (Q): Ensuring high standards of materials and safety measures.
  • Construction Supervision (C): Overseeing implementation, contractor performance, and timeline adherence.

Project Objectives

  • Enhance Road Infrastructure: Improve transportation and mobility for local communities.
  • Boost Regional Trade & Economy: Provide better access to markets, businesses, and trade routes.
  • Reduce Travel Time & Costs: Offer a faster and more reliable transportation route.
  • Ensure Road Safety: Implement modern safety features to prevent accidents.
  • Promote Long-Term Sustainability: Utilize durable construction materials for longevity.

Key Features of the Road Construction

  • High-Quality Asphalt Pavement: Ensuring smooth and long-lasting road surfaces.
  • Efficient Drainage System: Preventing water accumulation, erosion, and road damage.
  • Protective Road Barriers & Signage: Enhancing driver safety and navigation.
  • Eco-Friendly Construction Techniques: Minimizing environmental impact.

Project Challenges

Despite substantial progress, several challenges exist:

  • Challenging Terrain: The hilly and uneven landscape makes construction complex.
  • Weather Disruptions: Adverse climatic conditions can impact project timelines.
  • Material Transportation: Ensuring a steady supply of construction materials in remote areas.
  • Security & Accessibility Concerns: Addressing regional security challenges during project execution.
  • Budget & Time Management: Balancing cost efficiency while maintaining construction quality.

The Widening, Improvement & BTR from Toor Nazon to Stara Kada via Kisa Khail & Road from Ghaki to Vatakai is a critical infrastructure project aimed at strengthening road networks, improving accessibility, and driving economic development in Lower Kurram. Once completed, this 5 km road will provide a safer, faster, and more reliable transportation route, benefiting both local residents and businesses.

Worker at conbuild

fantastic experience. They truly understood​

 our vision and turned our dream home into a reality. The attention to detail and dedication were The team and growth work.