Widening, Improvement & BTR from Toor Nazon to Stara Kada via Kisa Khail & Road from Ghaki to Vatakai – Lower Kurram
The Widening, Improvement & Blacktop Road (BTR) Project from Toor Nazon to Stara Kada via Kisa Khail and Road from Ghaki to Vatakai is a key infrastructure development initiative in Lower Kurram, undertaken by C&W (Communication & Works Department). This project focuses on the construction and enhancement of a 5 km road, ensuring improved connectivity, safety, and economic growth in the region.
Project Overview
- Project Location: Lower Kurram
- Executing Agency: C&W Department
- Project Start Date: June 20, 2022
- Current Status: In Progress
- Total Project Cost: 515.69 million PKR
- Consultancy Budget: 9.6 million PKR
- Firm Type: Single Firm
Scope of Work
The project involves the upgradation, widening, and blacktopping of a 5 km road, ensuring a smooth and efficient transportation network. Key project activities include:
- Feasibility Study (F): Conducting technical and economic viability assessments.
- Surveying (S): Performing topographic and geotechnical surveys for proper alignment.
- Designing (D): Preparing structural road designs to withstand heavy traffic loads.
- Quality Assurance (Q): Ensuring high standards of materials and safety measures.
- Construction Supervision (C): Overseeing implementation, contractor performance, and timeline adherence.
Project Objectives
- Enhance Road Infrastructure: Improve transportation and mobility for local communities.
- Boost Regional Trade & Economy: Provide better access to markets, businesses, and trade routes.
- Reduce Travel Time & Costs: Offer a faster and more reliable transportation route.
- Ensure Road Safety: Implement modern safety features to prevent accidents.
- Promote Long-Term Sustainability: Utilize durable construction materials for longevity.
Key Features of the Road Construction
- High-Quality Asphalt Pavement: Ensuring smooth and long-lasting road surfaces.
- Efficient Drainage System: Preventing water accumulation, erosion, and road damage.
- Protective Road Barriers & Signage: Enhancing driver safety and navigation.
- Eco-Friendly Construction Techniques: Minimizing environmental impact.
Project Challenges
Despite substantial progress, several challenges exist:
- Challenging Terrain: The hilly and uneven landscape makes construction complex.
- Weather Disruptions: Adverse climatic conditions can impact project timelines.
- Material Transportation: Ensuring a steady supply of construction materials in remote areas.
- Security & Accessibility Concerns: Addressing regional security challenges during project execution.
- Budget & Time Management: Balancing cost efficiency while maintaining construction quality.
The Widening, Improvement & BTR from Toor Nazon to Stara Kada via Kisa Khail & Road from Ghaki to Vatakai is a critical infrastructure project aimed at strengthening road networks, improving accessibility, and driving economic development in Lower Kurram. Once completed, this 5 km road will provide a safer, faster, and more reliable transportation route, benefiting both local residents and businesses.