gsk logo (1)

Great Water Supply Scheme Juglote

Clients:
Govt. of GB PWD Gilgit
Scope of work:
Water Supply Project
Timeframe:
Inprogress
Location:
Juglote Gilgit

Great Water Supply Scheme Juglote

The Great Water Supply Scheme Juglote is a vital infrastructure project undertaken by the Government of Gilgit-Baltistan PWD (Public Works Department). The project aims to enhance the water supply system in Juglote, Gilgit, ensuring a reliable and sustainable water distribution network for the local population.

Project Overview

  • Project Location: Juglote, Gilgit
  • Executing Agency: Govt. of GB PWD Gilgit
  • Project Start Date: June 29, 2021
  • Current Status: In Progress
  • Project Cost: Not disclosed
  • Consultancy Budget: 4.525 million PKR
  • Project Type: Water Supply Project
  • Firm Type: Lead Firm in JV
  • Consulting Partner: M/s IGES Int.

Scope of Work

The project involves designing, reviewing, and vetting a modernized water supply system. The main components of the project include:

  • Hydrological & Geological Assessment to determine the best water sources.
  • Pipeline Network Design to ensure efficient water distribution.
  • Reservoir Construction & Storage Management for continuous supply.
  • Pump Station & Filtration System Design to improve water quality.
  • Sustainability & Maintenance Planning for long-term functionality.

Project Objectives

  • Provide Clean & Safe Drinking Water to the residents of Juglote.
  • Enhance Water Supply Infrastructure for urban and rural areas.
  • Ensure Sustainable Water Management through modern techniques.
  • Improve Public Health by reducing waterborne diseases.
  • Strengthen Disaster Resilience by securing a reliable water source.

Key Features of the Water Supply System

1. Modern Water Treatment & Distribution

  • Filtration & Purification Systems to maintain water quality.
  • Pumping Stations & Reservoirs for continuous water supply.
  • Smart Metering & Monitoring to track consumption and detect leaks.
  • Gravity-fed & Pressurized Pipeline System for efficient delivery.

2. Environmental Sustainability & Water Conservation

  • Water Recycling & Reuse Strategies to minimize wastage.
  • Rainwater Harvesting Mechanisms for additional water sources.
  • Eco-friendly Infrastructure to reduce the environmental impact.

Project Challenges

Despite strategic planning, the project faces several challenges:

  • Geographical Barriers: The mountainous terrain poses difficulties in laying pipelines and constructing reservoirs.
  • Extreme Weather Conditions: Harsh winters and seasonal water availability impact construction and operation.
  • Water Source Management: Ensuring sustainable water extraction without depleting local resources.
  • Community Engagement: Encouraging local participation for awareness and conservation efforts.
  • Budget & Resource Allocation: Managing financial and logistical constraints for timely completion.

Conclusion

The Great Water Supply Scheme Juglote is a transformational project aimed at improving water accessibility and public health in Gilgit. Through modern infrastructure, sustainable management, and innovative water distribution techniques, this initiative will ensure a long-term, safe, and reliable water supply for the people of Juglote.

Worker at conbuild

fantastic experience. They truly understood​

 our vision and turned our dream home into a reality. The attention to detail and dedication were The team and growth work.