gsk logo (1)

F/s & Construction of Parking Plazas

Clients:
C&W
Scope of work:
Car Parking Plaza
Timeframe:
Inprogress
Location:
Swat

Feasibility Study & Construction of Parking Plazas in Swat

The Feasibility Study & Construction of Parking Plazas project, initiated by C&W (Communication & Works Department), aims to address urban traffic congestion in Swat by developing modern car parking plazas. This project involves designing, reviewing, and vetting efficient parking solutions to support the increasing number of vehicles in the city.

Project Overview

  • Project Location: Swat
  • Executing Agency: C&W Department
  • Project Start Date: January 26, 2023
  • Current Status: In Progress
  • Total Budget: 70 million PKR
  • Firm Type: Single Firm

Scope of Work

The project encompasses a detailed feasibility study, structural design, and implementation of parking plazas to ease traffic congestion. The key tasks include:

  • Feasibility Study: Analyzing traffic flow, space utilization, and environmental impact.
  • Designing: Creating efficient, multi-story parking structures to maximize capacity.
  • Reviewing: Assessing designs for safety, sustainability, and accessibility.
  • Vetting: Ensuring all construction plans meet regulatory and engineering standards.

Project Objectives

  • Reduce traffic congestion by providing dedicated parking spaces.
  • Improve urban infrastructure to accommodate growing vehicle numbers.
  • Enhance accessibility and mobility for residents and visitors.
  • Ensure sustainable and eco-friendly construction practices.
  • Optimize land use for efficient space management in Swat.

Key Features of the Parking Plaza

1. Modern Parking Facilities

Each parking plaza will include:

  • Multi-level parking with designated spots for different vehicle types.
  • Automated ticketing and entry/exit systems for smooth operations.
  • EV charging stations to support electric vehicles.
  • Disabled-friendly access with ramps and elevators.
  • CCTV surveillance & security systems for enhanced safety.

2. Sustainable Infrastructure

  • Smart parking solutions with real-time space availability updates.
  • Solar-powered lighting to minimize energy consumption.
  • Rainwater harvesting systems for eco-friendly water management.
  • Proper ventilation & fire safety mechanisms to ensure user safety.

Project Challenges

Despite the strategic planning, several challenges are anticipated:

  • Limited Urban Space: Finding suitable locations for large parking structures.
  • Traffic Disruptions: Managing construction activities without affecting daily traffic flow.
  • Budget Constraints: Ensuring cost-effective yet high-quality construction.
  • Environmental Impact: Implementing green solutions to mitigate effects on the local ecosystem.
  • Public Awareness & Acceptance: Encouraging residents and businesses to utilize the new parking plazas.

Conclusion

The Feasibility Study & Construction of Parking Plazas in Swat is a crucial step towards modernizing urban transport infrastructure. By developing well-planned, efficient parking solutions, this project will reduce congestion, improve accessibility, and contribute to a sustainable urban environment in Swat.

Worker at conbuild

fantastic experience. They truly understood​

 our vision and turned our dream home into a reality. The attention to detail and dedication were The team and growth work.