Widening, Improvement & BTR from Sher Khan Khapa to Taritang via Zara Mela and Road from Kochi Bridge to Makhizai – Lower Kurram
The Widening, Improvement & Blacktop Road (BTR) Project from Sher Khan Khapa to Taritang via Zara Mela and Road from Kochi Bridge to Makhizai is a major road infrastructure project in Lower Kurram, undertaken by C&W (Communication & Works Department). The project focuses on the construction and enhancement of a 7 km road, improving transportation efficiency, connectivity, and economic activity in the region.
Project Overview
- Project Location: Lower Kurram
- Executing Agency: C&W Department
- Project Start Date: June 20, 2022
- Current Status: In Progress
- Total Project Cost: 475.615 million PKR
- Consultancy Budget: 9.6 million PKR
- Firm Type: Single Firm
Scope of Work
The project includes the expansion, strengthening, and blacktopping of the 7 km road, ensuring a modern and high-quality road network. The key tasks involve:
- Feasibility Study (F): Assessing the economic and engineering feasibility of the road expansion.
- Surveying (S): Conducting land surveys, soil testing, and alignment studies.
- Designing (D): Preparing modern road design plans for enhanced durability and safety.
- Quality Assurance (Q): Implementing strict quality control measures for construction materials and techniques.
- Construction Supervision (C): Monitoring the execution process to ensure timely completion and compliance with safety standards.
Project Objectives
- Improve Road Infrastructure: Upgrade existing roads for smooth and efficient transportation.
- Enhance Connectivity: Facilitate easy access to towns, villages, and marketplaces.
- Boost Economic Growth: Support trade, agriculture, and commercial activities through better roads.
- Reduce Travel Time & Costs: Provide faster and safer routes for daily commuters.
- Ensure Long-Term Sustainability: Develop a durable road network that withstands environmental challenges.
Key Features of the Road Construction
- Widened & Blacktopped Surface: Ensuring high load-bearing capacity and smooth travel.
- Drainage & Water Management Systems: Preventing flooding and erosion damage.
- Safety Enhancements: Adding road signs, markings, protective barriers, and lighting.
- Eco-Friendly Construction: Utilizing sustainable practices for environmental conservation.
Project Challenges
Several challenges have been encountered during project execution, including:
- Challenging Terrain: Constructing roads in hilly and rugged landscapes.
- Weather Conditions: Delays due to unpredictable weather patterns and harsh seasonal conditions.
- Material Transportation: Ensuring a steady supply of construction materials to remote areas.
- Security & Accessibility Issues: Managing logistical challenges in the merged districts.
- Budget & Timeline Constraints: Balancing cost-effectiveness and timely completion while maintaining high-quality standards.
The Widening, Improvement & BTR from Sher Khan Khapa to Taritang via Zara Mela and Road from Kochi Bridge to Makhizai is a significant infrastructure development project aimed at enhancing transportation networks, boosting economic activities, and improving accessibility in Lower Kurram. Once completed, this 7 km road will serve as a vital link for local communities, reducing travel time, increasing safety, and contributing to regional development.