gsk logo (1)

Vetting of Mittai Bridge Design planned to be constructed in District Mommand CV Bazai

Clients:
UNDP
Scope of Services:
F, S, D,Q, C
Scope of work:
Vetting of Mittai Bridge Design planned to be constructed in District Mommand
Timeframe:
Completed
Location:
Mommand Merged Area

Vetting of Mittai Bridge Design – District Mohmand

The Vetting of Mittai Bridge Design is a key infrastructure project undertaken by UNDP in the Mohmand Merged Area. The project focuses on evaluating and reviewing the bridge design to ensure structural integrity, safety, and compliance with engineering standards before its construction.

Project Overview

  • Project Location: Mohmand Merged Area
  • Executing Agency: UNDP
  • Project Start Date: August 4, 2023
  • Completion Date: November 4, 2023
  • Total Project Cost: 0.58 million PKR
  • Consultancy Budget: 0.58 million PKR
  • Firm Type: Single Firm

Scope of Work

This project involves technical evaluation and validation of the Mittai Bridge design, ensuring quality, durability, and structural efficiency. Key activities include:

  • Feasibility Study (F): Assessing the viability and expected performance of the bridge.
  • Surveying (S): Conducting geotechnical and hydrological studies to determine site suitability.
  • Design Review (D): Evaluating bridge structure, material specifications, and load-bearing capacity.
  • Quality Assurance (Q): Ensuring compliance with engineering and safety standards.
  • Construction Supervision (C): Providing technical recommendations for execution.

Project Objectives

  • Ensure Structural Stability: Validate the design against environmental and load conditions.
  • Enhance Safety Measures: Review material strength, seismic resistance, and flood protection.
  • Optimize Construction Efficiency: Recommend cost-effective and sustainable solutions.
  • Improve Longevity & Durability: Confirm high-quality design to withstand harsh conditions.
  • Facilitate Seamless Construction: Address potential design challenges before execution.

Key Features of the Mittai Bridge Design Vetting

  • Geotechnical & Hydrological Risk Assessment: Identifying soil and water-related challenges.
  • Load-Bearing Analysis: Ensuring sufficient capacity for heavy vehicles and traffic flow.
  • Flood & Seismic Resistance Review: Evaluating the bridge’s ability to withstand natural hazards.
  • Structural Optimization: Recommending improvements for durability and cost-efficiency.

Project Challenges

Several challenges are associated with the project:

  • Geographical Terrain Issues: The hilly and river-crossing landscape poses design challenges.
  • Hydrological Risks: Heavy rainfall and potential flooding may affect the structural performance.
  • Regulatory Compliance: Ensuring all engineering codes and safety regulations are met.
  • Material Selection Validation: Reviewing proposed construction materials for quality assurance.
  • Budget Constraints: Optimizing cost-effective solutions while maintaining high standards.

Conclusion

The Vetting of Mittai Bridge Design in District Mohmand is a crucial step toward ensuring a strong, reliable, and long-lasting bridge infrastructure. By validating the design through comprehensive technical review, this project will contribute to safe and efficient construction, improved connectivity, and sustainable development in the region.

Worker at conbuild

fantastic experience. They truly understood​

 our vision and turned our dream home into a reality. The attention to detail and dedication were The team and growth work.