Supervision of Mittai Bridge – District Mohmand
The Supervision of Mittai Bridge project in District Mohmand Merged Area is a key infrastructure initiative undertaken by UNDP. This project aims to ensure efficient construction and quality assurance for the Mittai Bridge, which is planned to enhance connectivity and facilitate transportation in the region.
Project Overview
- Project Location: District Mohmand, Merged Area
- Executing Agency: UNDP
- Project Start Date: August 4, 2023
- Current Status: In Progress
- Total Project Cost: 38.7 million PKR
- Consultancy Budget: 3.67 million PKR
- Firm Type: Single Firm
Scope of Work
The project involves detailed supervision, design vetting, and quality control to ensure the bridge's structural integrity and functionality. The major tasks include:
- Feasibility Study (F): Assessing the structural and economic viability of the bridge.
- Surveying (S): Conducting topographic and geotechnical surveys to determine suitable site conditions.
- Designing (D): Vetting and optimizing the bridge design for durability and efficiency.
- Quality Assurance (Q): Ensuring compliance with construction safety and material standards.
- Construction Supervision (C): Overseeing on-site execution, contractor performance, and project timelines.
Project Objectives
- Improve Transportation Infrastructure: Provide safe and reliable connectivity for residents and businesses.
- Enhance Regional Development: Facilitate trade, mobility, and economic activities.
- Ensure Structural Durability: Implement high-quality materials and engineering standards.
- Reduce Travel Time & Costs: Create efficient transport routes for the local population.
- Promote Sustainable Development: Adopt environment-friendly construction practices.
Key Features of the Mittai Bridge
- Modern Bridge Design: Incorporates reinforced concrete structure for longevity.
- Load-Bearing Capacity: Engineered to handle heavy vehicles and local transportation needs.
- Enhanced Safety Measures: Includes guardrails, pedestrian pathways, and flood resistance features.
- Efficient Drainage System: Designed to prevent water accumulation and structural erosion.
- Connectivity Boost: Links remote areas with main roads for improved accessibility.
Project Challenges
The project encounters several challenges, including:
- Challenging Terrain: Constructing a bridge in a mountainous and rugged landscape.
- Weather Conditions: Extreme weather may impact construction progress and material durability.
- Security Concerns: Working in a merged area with security and logistical constraints.
- Material Transportation: Ensuring timely supply of high-quality construction materials.
- Regulatory Approvals: Securing necessary permits and compliance with government regulations.
The Supervision of Mittai Bridge in District Mohmand is a transformative infrastructure project that will enhance transportation, boost economic growth, and improve accessibility in the region. Once completed, the bridge will serve as a critical link for local communities, ensuring safe, efficient, and sustainable mobility for years to come.