gsk logo (1)

KP- RRDP 942km Roads

Clients:
C&W Peshawar
Scope of Services:
Design Review
Scope of work:
20m length bridge & interchange
Timeframe:
Inprogress
Location:
Peshawar, Galiyat & Swat

KP-RRDP 942km Roads – Design Review

The KP-RRDP (Khyber Pakhtunkhwa Rural Roads Development Program) is a major infrastructure initiative aimed at enhancing road connectivity and transportation networks across Peshawar, Galiyat, and Swat. This project, managed by C&W Peshawar, focuses on the design review of 942 kilometers of roads, ensuring high-quality infrastructure and sustainable road development in the province.

Project Overview

  • Project Location: Peshawar, Galiyat & Swat
  • Executing Agency: C&W Peshawar
  • Project Start Date: February 17, 2025
  • Expected Completion Date: May 17, 2025
  • Total Project Cost: 105 billion PKR
  • Consultancy Budget: 27.945 million PKR
  • Firm Type: Lead Firm in JV
  • Consulting Partner: GES

Scope of Work

This project involves a detailed design review of 942 km of roads, ensuring adherence to modern engineering standards, road safety guidelines, and environmental sustainability. The key tasks include:

  • Design Review: Evaluating alignment, pavement structure, and drainage systems.
  • Geotechnical & Hydrological Assessments: Ensuring stability and water management efficiency.
  • Traffic & Load Capacity Analysis: Reviewing road durability under various traffic conditions.
  • Safety & Environmental Compliance: Implementing sustainable and eco-friendly road design solutions.
  • Quality Control & Assurance: Ensuring high construction standards and material specifications.

Project Objectives

  • Improve Road Connectivity: Enhance rural and urban access across KP.
  • Boost Economic Growth: Facilitate trade, tourism, and local businesses.
  • Ensure Sustainable Infrastructure: Develop long-lasting and eco-friendly roads.
  • Enhance Safety Measures: Implement modern road safety designs for commuters.
  • Reduce Travel Time & Costs: Provide efficient transport routes for local and commercial traffic.

Key Features of the Project

  • 942km of Road Network: Covering key districts and strategic transportation routes.
  • High-Quality Pavement Design: Ensuring durability and smooth traffic flow.
  • Integrated Drainage Systems: Preventing flooding and waterlogging.
  • Eco-Friendly Road Construction: Using sustainable materials and erosion control techniques.
  • Modern Traffic Management Solutions: Enhancing road safety with proper signage and lighting.

Project Challenges

The project faces several challenges, including:

  • Difficult Terrain: Constructing roads in hilly and remote regions.
  • Weather Conditions: Adverse climatic changes affecting road stability.
  • Budget & Resource Management: Ensuring cost-effective solutions while maintaining quality.
  • Regulatory Approvals: Meeting government infrastructure and environmental compliance.
  • Community & Stakeholder Coordination: Ensuring smooth execution with local support.

Conclusion

The KP-RRDP 942km Roads Design Review is a landmark infrastructure project that will transform transportation in Khyber Pakhtunkhwa. Once completed, this project will enhance regional connectivity, improve economic opportunities, and provide a safer and more efficient road network for the province.

Worker at conbuild

fantastic experience. They truly understood​

 our vision and turned our dream home into a reality. The attention to detail and dedication were The team and growth work.