gsk logo (1)

F/S for Dualization of Road from Main Swabi Road to Bakhshali Interchange

Clients:
C&W
Scope of Services:
F, S, D,Q, C
Scope of work:
F/s & Design of Raod from Swabi to Bakhshali Interchange
Timeframe:
Completed
Location:
Raod From Swabi to Bakhshali Interchange

Feasibility Study for Dualization of Road from Main Swabi Road to Bakhshali Interchange

The Feasibility Study (F/S) and Design for the Dualization of the Road from Main Swabi Road to Bakhshali Interchange is a significant infrastructure project aimed at enhancing road capacity, improving traffic flow, and ensuring safer transportation. This initiative, undertaken by C&W (Communication & Works Department), focuses on evaluating the technical, financial, and environmental aspects of dualizing the road, making it more efficient and sustainable.

Project Overview

  • Project Location: Road from Swabi to Bakhshali Interchange
  • Executing Agency: C&W Department
  • Project Start Date: March 4, 2021
  • Completion Date: May 30, 2021
  • Total Project Cost: 100 million PKR
  • Consultancy Budget: 12.1 million PKR
  • Firm Type: Single Firm

Scope of Work

The project involves conducting a comprehensive feasibility study and design process to determine the best approach for dualizing the road. The key tasks include:

  • Feasibility Study (F): Evaluating the economic viability and potential benefits of the dualization.
  • Surveying (S): Conducting topographic, traffic, and soil investigations for optimal road design.
  • Designing (D): Preparing detailed architectural and structural plans for road expansion.
  • Quality Assurance (Q): Ensuring adherence to national and international safety and engineering standards.
  • Construction Planning (C): Developing a step-by-step implementation strategy for road dualization.

Project Objectives

  • Improve Traffic Flow: Reduce congestion and delays by expanding the road capacity.
  • Enhance Road Safety: Minimize accidents and traffic hazards through a well-planned road network.
  • Boost Economic Development: Support trade, tourism, and regional connectivity.
  • Reduce Travel Time & Costs: Provide a smoother, more efficient transportation route.
  • Ensure Sustainable Infrastructure: Design a long-lasting and eco-friendly road system.

Key Features of the Road Dualization

  • Widening & Expansion: Upgrading a single-lane road to a dual-lane highway.
  • Improved Road Geometry: Enhancing curves, gradients, and intersections for safety.
  • Advanced Drainage System: Preventing flooding and erosion-related damage.
  • Traffic Management Solutions: Installing signage, road markings, and safety barriers.
  • Eco-Friendly Construction Approach: Implementing low-carbon footprint materials.

Project Challenges

The project faces several challenges, including:

  • Land Acquisition Issues: Securing additional land for road expansion.
  • Environmental Concerns: Ensuring minimal ecological disruption during construction.
  • Traffic Diversions & Management: Managing vehicular movement during dualization work.
  • Budget & Timeline Constraints: Balancing cost-effective solutions while maintaining quality.
  • Infrastructure Upgrades: Integrating existing roadways with new dualized sections.

Conclusion

The Feasibility Study & Design for the Dualization of the Road from Main Swabi Road to Bakhshali Interchange is a crucial infrastructure initiative aimed at improving transportation, enhancing road safety, and boosting economic growth in the region. Once implemented, this project will enhance mobility, reduce travel time, and create a modern road network that supports long-term regional development.

Worker at conbuild

fantastic experience. They truly understood​

 our vision and turned our dream home into a reality. The attention to detail and dedication were The team and growth work.