gsk logo (1)

F/S, Design & Construction of Badalai Bridge at Madyan

Clients:
C&W
Scope of Services:
F, S, D,Q, C
Scope of work:
150m length bridge, 30m span & approach road
Timeframe:
Inprogress
Location:
Swat

Feasibility Study, Design & Construction of Badalai Bridge at Madyan – Swat

The Feasibility Study, Design & Construction of Badalai Bridge at Madyan is a key infrastructure project in Swat, initiated by C&W (Communication & Works Department). The project involves the construction of a 150-meter-long bridge with a 30-meter span, along with an approach road to improve connectivity and enhance regional transportation.

Project Overview

  • Project Location: Madyan, Swat
  • Executing Agency: C&W Department
  • Project Start Date: January 18, 2022
  • Current Status: In Progress
  • Total Project Cost: 280 million PKR
  • Consultancy Budget: 12.18 million PKR
  • Firm Type: Single Firm

Scope of Work

The project focuses on the design, engineering, and construction of a modern and durable bridge with an integrated road network. The key tasks include:

  • Feasibility Study (F): Conducting technical and economic assessments for bridge construction.
  • Surveying (S): Performing geotechnical and hydrological surveys to ensure structural stability.
  • Designing (D): Developing a structural design for a 150-meter bridge with a 30-meter span.
  • Quality Assurance (Q): Implementing high safety and material quality standards.
  • Construction Supervision (C): Overseeing bridge execution, contractor compliance, and project timelines.

Project Objectives

  • Enhance Regional Connectivity: Provide a vital transport link between Madyan and surrounding areas.
  • Improve Transportation Efficiency: Facilitate faster and safer movement of people and goods.
  • Support Economic Growth: Boost trade, tourism, and local business development.
  • Ensure Structural Durability: Construct a flood-resistant, earthquake-resistant bridge.
  • Promote Sustainable Infrastructure: Use modern engineering techniques for long-term functionality.

Key Features of the Bridge Construction

  • 150m Total Length & 30m Span: Engineered for high load-bearing capacity.
  • Reinforced Concrete Structure: Designed for durability and extreme weather resistance.
  • Approach Road Development: Smooth connectivity to existing road networks.
  • Flood Protection Measures: Elevated bridge design to withstand river surges and heavy rainfall.
  • Safety Enhancements: Including guardrails, lighting, and pedestrian pathways.

Project Challenges

Despite strategic planning, several challenges exist:

  • Challenging Terrain: Constructing the bridge in a hilly, river-crossing landscape.
  • Extreme Weather Conditions: Heavy rainfall and potential flooding could impact construction.
  • Material Transportation Issues: Ensuring timely delivery of construction materials in remote areas.
  • Hydrological Risks: Assessing water flow and erosion to prevent structural damage.
  • Budget & Timeline Constraints: Managing cost efficiency and ensuring timely completion.

Conclusion

The Feasibility Study, Design & Construction of Badalai Bridge at Madyan is a transformational infrastructure project that will enhance connectivity, improve transportation safety, and boost economic activities in Swat. Once completed, this 150m-long bridge will serve as a critical link for residents, businesses, and tourists, ensuring safe and efficient travel for years to come.

Worker at conbuild

fantastic experience. They truly understood​

 our vision and turned our dream home into a reality. The attention to detail and dedication were The team and growth work.