gsk logo (1)

Establishment of 500 bed Peads Hospital at District Swat

pro-details
Clients:
C&W Swat
Scope of work:
Construction
Timeframe:
Inprogress
Location:
Swat

Establishment of 500 bed Peads Hospital at District Swat

Project Overview

The Establishment of a 500-Bed Pediatric Hospital in District Swat is a landmark healthcare project aimed at providing specialized medical services for children in the region. This state-of-the-art facility is designed to enhance pediatric healthcare, improve patient care, and provide modern medical infrastructure. The hospital will include advanced medical equipment, well-equipped wards, and dedicated hostels for medical staff, ensuring high-quality services for both patients and healthcare professionals.

Client and Location

  • Client: C&W Swat
  • Location: Swat, Pakistan

Project Timeline

  • Project Start Date: February 24, 2020
  • Project Status: In Progress

Project Cost and Consultancy

  • Total Project Cost: 2.745 Billion PKR
  • Consultancy Cost: 8.734 Million PKR

Scope of Services

The project includes full-fledged construction supervision and consultancy services to ensure the highest quality standards, safety compliance, and timely execution. The key services include:

  • Feasibility Study (F): Evaluating the project's potential impact and sustainability.
  • Structural Design (S): Developing a robust and earthquake-resistant structure.
  • Detailed Design (D): Creating comprehensive architectural, engineering, and operational layouts.
  • Quality Control (Q): Monitoring construction materials and workmanship for superior quality.
  • Construction Supervision (C): Overseeing project execution, ensuring adherence to specifications.

Scope of Work

The hospital complex comprises multiple facilities to support patient care, staff accommodation, and essential services. The major components include:

  • Main Hospital Building – Houses medical wards, operation theaters, ICU, emergency, and outpatient departments.
  • Doctor's Hostel (Male & Female) – Separate accommodation for male and female doctors.
  • Nursing Hostel – Living facilities for nurses working at the hospital.
  • Paramedic Hostel – Dedicated accommodation for paramedic staff.
  • Cafeteria – A food court providing meals for patients, visitors, and staff.
  • Mosque – A prayer facility within the hospital premises.
  • Boundary Wall – Security and privacy enclosure for the hospital premises.
  • Internal Roads – Well-structured roadways to ensure smooth movement within the facility.
  • Overhead Water Tank – Ensuring uninterrupted water supply.
  • Pump Room – Facilitating water distribution and supply systems.
  • Tube Well – A sustainable water source for hospital needs.

Project Management

  • Handled As: Lead Firm in Joint Venture (JV)
  • Consultancy Firm: MASCOT Consultants

Significance of the Project

This hospital will be a major healthcare milestone in Swat, providing specialized pediatric care to the region. With 500 beds, modern infrastructure, and comprehensive medical facilities, this project will significantly improve child healthcare services and reduce the need for patients to travel long distances for treatment.

Project Challenges

1. Budget and Cost Management

  • Ensuring efficient use of the 2.745 billion PKR budget while maintaining quality.
  • Managing cost fluctuations in construction materials, labor, and medical equipment.

2. Timely Completion of Construction

  • The project has faced delays due to external factors such as supply chain disruptions and labor shortages.
  • Ensuring the project meets the targeted deadlines despite construction complexities.

3. Compliance with Medical and Safety Standards

  • Adhering to international healthcare building standards for hospitals.
  • Implementing infection control measures and safety protocols during construction.

4. Infrastructure and Utility Challenges

  • Establishing reliable water, electricity, and gas supply systems.
  • Ensuring proper sewage and drainage management.

5. Skilled Workforce Availability

  • Hiring and retaining qualified engineers, construction workers, and consultants.
  • Providing continuous training for staff on modern construction techniques.

6. Security and Access Issues

  • Managing security measures for the construction site.
  • Addressing transportation challenges for labor, raw materials, and equipment.

7. Environmental and Sustainability Concerns

  • Reducing environmental impact by adopting eco-friendly construction materials.
  • Implementing energy-efficient hospital solutions for long-term sustainability.

By addressing these challenges effectively, this project will play a vital role in transforming pediatric healthcare in Swat, ensuring a modern, well-equipped, and fully functional hospital that will benefit thousands of children for generations to come.

portfolio-img1
portfolio-img2

Worker at conbuild

fantastic experience. They truly understood​

 our vision and turned our dream home into a reality. The attention to detail and dedication were The team and growth work.