gsk logo (1)
gsk logo (1)

Establishment of 110 bed DHQ Hospital at Ghazi Abad

pro-details
Clients:
C&W Kohistan
Scope of work:
Construction
Timeframe:
Inprogress
Location:
Kolai Palas

Establishment of 110 bed DHQ Hospital at Ghazi Abad

Project Overview

The Establishment of a 110-Bed DHQ Hospital in Ghazi Abad, Kolai Palas is a crucial healthcare project aimed at enhancing medical infrastructure in the region. This hospital will provide quality healthcare services, advanced medical facilities, and specialized treatments to cater to the growing medical needs of the local population.

Client and Location

  • Client: C&W Kohistan
  • Location: Kolai Palas, Pakistan

Project Timeline

  • Project Start Date: February 20, 2020
  • Project Status: In Progress

Project Cost and Consultancy

  • Total Project Cost: 1.254 Billion PKR
  • Consultancy Cost: 11.998 Million PKR

Scope of Services

The project involves comprehensive supervision and consultancy to ensure the successful completion of the hospital with high-quality construction, safety compliance, and efficient management. The services provided include:

  • Feasibility Study (F): Assessing the project's viability and impact.
  • Structural Design (S): Developing a durable and earthquake-resistant structure.
  • Detailed Design (D): Preparing architectural and engineering layouts.
  • Quality Control (Q): Ensuring top-quality materials and construction practices.
  • Construction Supervision (C): Overseeing the entire construction process.

Scope of Work

The hospital will be equipped with modern medical facilities and multiple specialized blocks to provide extensive healthcare services. The major components include:

  • Main OPD, Burn Unit, Labs, Casualty Ward – Providing outpatient consultations, burn treatments, laboratory testing, and emergency services.
  • Gynecology & Pediatrics Block – Dedicated facilities for maternal and child healthcare.
  • ICU & CCU Block – Intensive care and critical care units for serious medical conditions.
  • ENT & Eye Block – Specialized treatments for ear, nose, throat, and eye diseases.
  • Medical & Surgery Block – Comprehensive medical and surgical treatment facilities.
  • Male Hostel – Accommodation for male doctors and staff.
  • Female Hostel – Living facilities for female doctors and medical personnel.
  • Nursing Hostel – Dedicated hostel for nurses working in the hospital.
  • Residences – Residential quarters for senior medical staff and specialists.

Project Management

  • Handled As: Lead Firm in Joint Venture (JV)
  • Consultancy Firm: MASCOT Consultants

Significance of the Project

This District Headquarters (DHQ) Hospital will play a crucial role in providing accessible and high-quality healthcare to the people of Kolai Palas and surrounding areas. The establishment of modern healthcare blocks, specialized medical units, and well-equipped hostels will ensure the availability of 24/7 emergency care, advanced diagnostics, and critical treatments.

Project Challenges

1. Geographical and Logistical Constraints

  • Kolai Palas is a remote and mountainous region, making transportation of construction materials and workforce a challenge.
  • Limited road access and connectivity issues have slowed the progress of the project.

2. Budget and Financial Management

  • Ensuring efficient utilization of the 1.254 billion PKR budget while maintaining high-quality standards.
  • Managing fluctuations in material costs and labor wages due to economic conditions.

3. Skilled Workforce and Labor Shortages

  • Hiring and retaining skilled engineers, laborers, and medical consultants in a remote area.
  • Providing proper training to construction workers for hospital-specific infrastructure.

4. Compliance with Healthcare Regulations

  • Ensuring the hospital meets national and international medical facility standards.
  • Adhering to sanitation, safety, and hygiene protocols during construction.

5. Utility and Infrastructure Development

  • Establishing reliable water, electricity, and gas supply systems for uninterrupted hospital operations.
  • Implementing proper sewage, waste management, and drainage systems.

6. Security and Environmental Factors

  • Ensuring safety measures for workers and staff due to regional security concerns.
  • Adopting eco-friendly construction techniques to minimize environmental impact.

By overcoming these challenges, the 110-bed DHQ Hospital in Ghazi Abad will provide state-of-the-art healthcare services, significantly improving the health standards and medical accessibility in the region. This project is a step towards modernizing healthcare infrastructure in rural and underdeveloped areas of Pakistan.

portfolio-img1
portfolio-img2

Worker at conbuild

fantastic experience. They truly understood​

 our vision and turned our dream home into a reality. The attention to detail and dedication were The team and growth work.