gsk logo (1)

Designing of Military Bridge Abutments in Khyber Merged District

Clients:
2 Engineer Battalion
Scope of Services:
F, S, D,Q, C
Scope of work:
20 m length bridge, 2 span with approach road
Timeframe:
Completed
Location:
Khyber Merged Area

Designing of Military Bridge Abutments in Khyber Merged District

The Designing of Military Bridge Abutments in the Khyber Merged District is a critical infrastructure project initiated by the 2 Engineer Battalion. This project involves the design of a 20-meter-long bridge with two spans and an approach road, ensuring strong, durable, and strategically reliable connectivity for military and logistics operations in the region.

Project Overview

  • Project Location: Khyber Merged Area
  • Executing Agency: 2 Engineer Battalion
  • Project Start Date: April 29, 2022
  • Completion Date: June 30, 2022
  • Total Project Cost: 0.5 million PKR
  • Consultancy Budget: 0.5 million PKR
  • Firm Type: Single Firm

Scope of Work

The project focuses on the structural design and assessment of bridge abutments, ensuring high stability, load-bearing capacity, and resilience in challenging terrain. The major tasks include:

  • Feasibility Study (F): Evaluating military and strategic requirements for the bridge.
  • Surveying (S): Conducting geotechnical, topographical, and hydrological assessments.
  • Designing (D): Developing structural plans for the bridge abutments and spans.
  • Quality Assurance (Q): Ensuring compliance with military safety standards and structural integrity.
  • Construction Planning (C): Providing detailed execution strategies for future construction.

Project Objectives

  • Strengthen Military Mobility: Facilitate efficient movement of personnel and equipment.
  • Enhance Structural Durability: Ensure high-strength design to withstand heavy loads and extreme conditions.
  • Improve Regional Connectivity: Provide a strategic transport route for defense and logistics.
  • Ensure Long-Term Stability: Design flood-resistant and seismic-resistant bridge abutments.
  • Promote Efficient Construction: Develop a cost-effective, structurally sound, and easily maintainable bridge design.

Key Features of the Bridge Design

  • 20m Length & 2 Span Bridge: Engineered for military-grade durability and heavy vehicle movement.
  • Reinforced Concrete Abutments: Providing strong support and resistance against erosion.
  • Approach Road Development: Ensuring seamless access for military convoys.
  • Flood & Seismic Resistance: Built to withstand environmental and operational challenges.
  • Advanced Safety Measures: Including reinforced guardrails, protective barriers, and camouflage integration.

Project Challenges

Several challenges were addressed during the design phase, including:

  • Difficult Terrain & Geological Conditions: Designing abutments for unstable or rugged landscapes.
  • Heavy Load Requirements: Ensuring structural integrity for armored vehicles and military transport.
  • Environmental Impact & Weather Conditions: Factoring in flood risks and seismic activity.
  • Security Considerations: Ensuring design confidentiality and military-grade safety standards.
  • Budget Constraints: Balancing cost-effectiveness with high-quality materials and long-term durability.

Conclusion

The Designing of Military Bridge Abutments in Khyber Merged District is a strategically significant project that will enhance military operations, improve transport efficiency, and provide a secure crossing point in the region. Once constructed, this 20-meter-long bridge with two spans and an approach road will serve as a vital defense infrastructure asset, ensuring safe and efficient movement of troops, equipment, and logistics.

Worker at conbuild

fantastic experience. They truly understood​

 our vision and turned our dream home into a reality. The attention to detail and dedication were The team and growth work.