CPEC Interchange Lassan Nawab Road – Mansehra
The CPEC Interchange Lassan Nawab Road is a strategic infrastructure project aimed at enhancing connectivity between Mansehra and the China-Pakistan Economic Corridor (CPEC). This project, undertaken by C&W (Communication & Works Department), includes the construction of a 20-meter-long bridge and an interchange, ensuring seamless traffic flow and improved road accessibility in the region.
Project Overview
- Project Location: Mansehra
- Executing Agency: C&W Department
- Project Start Date: February 9, 2021
- Current Status: In Progress
- Total Project Cost: 40 million PKR
- Consultancy Budget: 4.3 million PKR
- Firm Type: Single Firm
Scope of Work
The project involves the design, construction, and supervision of a modern interchange and bridge to facilitate traffic movement. The key project activities include:
- Feasibility Study (F): Conducting traffic flow analysis and economic feasibility assessments.
- Surveying (S): Performing topographic, geotechnical, and environmental impact studies.
- Designing (D): Developing an efficient interchange layout with a 20-meter-long bridge.
- Quality Assurance (Q): Ensuring compliance with road safety, material quality, and engineering standards.
- Construction Supervision (C): Overseeing execution, contractor performance, and timely completion.
Project Objectives
- Enhance Regional Connectivity: Provide smooth access to the CPEC route, reducing congestion.
- Improve Traffic Flow: Create a well-structured interchange for efficient vehicle movement.
- Support Economic Development: Facilitate trade, tourism, and local business growth.
- Ensure Structural Durability: Construct a long-lasting and resilient bridge.
- Promote Safe & Efficient Travel: Implement modern road safety measures.
Key Features of the CPEC Interchange
- 20m Length Bridge & Interchange: Designed to handle high traffic volumes.
- Multi-Lane Road Design: Ensuring smooth entry and exit points.
- Advanced Traffic Management System: Including signage, lighting, and lane markings.
- Drainage & Water Management System: Preventing flooding and road damage.
- Eco-Friendly Construction Practices: Minimizing environmental impact.
Project Challenges
The project faces several challenges, including:
- Heavy Traffic & Construction Management: Ensuring minimal disruption to ongoing traffic.
- Geotechnical & Structural Challenges: Addressing soil conditions and load-bearing capacity.
- Weather Conditions: Adverse weather may affect construction schedules.
- Budget & Resource Allocation: Managing costs while ensuring quality infrastructure.
- Regulatory Approvals & Compliance: Adhering to CPEC-related construction guidelines.
The CPEC Interchange Lassan Nawab Road is a critical transportation project that will improve connectivity, reduce travel time, and facilitate economic activities in Mansehra. Once completed, this 20-meter-long bridge and interchange will provide safe, efficient, and uninterrupted access to the CPEC route, benefiting businesses, travelers, and regional development.