Construction of Road from Balakot on Malam Jabba Road to Shangla Top

Clients:
C&W
Scope of Services:
F, S, D,Q, C
Scope of work:
Construction of 5.5 km road
Timeframe:
Inprogress
Location:
Swat

Construction of Road from Balakot on Malam Jabba Road to Shangla Top – Swat

The Construction of Road from Balakot on Malam Jabba Road to Shangla Top is a vital infrastructure project in Swat, undertaken by C&W (Communication & Works Department). The project focuses on the development of a 5.5 km road, enhancing accessibility to tourist destinations and local communities, improving trade, and promoting economic growth in the region.

Project Overview

  • Project Location: Swat
  • Executing Agency: C&W Department
  • Project Start Date: April 12, 2022
  • Current Status: In Progress
  • Total Project Cost: 230 million PKR
  • Consultancy Budget: 6.66 million PKR
  • Firm Type: Single Firm

Scope of Work

The project covers the planning, designing, and construction of a 5.5 km road, ensuring durability and long-term functionality. Key activities include:

  • Feasibility Study (F): Evaluating the technical and economic viability of the road.
  • Surveying (S): Conducting topographic, geotechnical, and environmental assessments.
  • Designing (D): Developing structural and pavement designs for enhanced durability.
  • Quality Assurance (Q): Implementing high construction standards, safety measures, and material testing.
  • Construction Supervision (C): Monitoring progress, contractor performance, and compliance with project specifications.

Project Objectives

  • Improve Road Connectivity: Establish a seamless travel route to Shangla Top, benefiting both locals and tourists.
  • Enhance Tourism & Economic Development: Facilitate access to Malam Jabba and nearby attractions, boosting tourism.
  • Reduce Travel Time & Costs: Provide a direct and efficient route, saving time and fuel costs.
  • Increase Safety & Accessibility: Ensure safe passage through hilly terrains, especially during extreme weather.
  • Ensure Long-Term Sustainability: Build a resilient road using modern engineering techniques.

Key Features of the Road Construction

  • High-Quality Asphalt Pavement: Ensuring smooth and durable travel conditions.
  • Proper Drainage System: Preventing flooding, landslides, and erosion.
  • Protective Road Barriers & Signage: Enhancing safety for drivers and pedestrians.
  • Eco-Friendly Construction Practices: Minimizing environmental impact while maintaining sustainability.

Project Challenges

Despite significant progress, the project faces several challenges:

  • Difficult Terrain: Constructing roads in mountainous landscapes poses engineering challenges.
  • Weather Conditions: Extreme weather in Swat’s high-altitude regions may impact construction timelines.
  • Material Transportation Issues: Ensuring timely delivery of construction materials to remote areas.
  • Landslides & Soil Erosion: Implementing stability measures to prevent road damage.
  • Budget & Time Constraints: Managing resources effectively to complete the project within the given timeframe.

The Construction of Road from Balakot on Malam Jabba Road to Shangla Top is a transformational infrastructure project that will improve mobility, boost tourism, and enhance economic activity in Swat. Once completed, this 5.5 km road will provide a safer, faster, and more accessible route, contributing to the development and prosperity of the region.