Construction of Road from Balakot on Malam Jabba Road to Shangla Top – Swat
The Construction of Road from Balakot on Malam Jabba Road to Shangla Top is a vital infrastructure project in Swat, undertaken by C&W (Communication & Works Department). The project focuses on the development of a 5.5 km road, enhancing accessibility to tourist destinations and local communities, improving trade, and promoting economic growth in the region.
Project Overview
- Project Location: Swat
- Executing Agency: C&W Department
- Project Start Date: April 12, 2022
- Current Status: In Progress
- Total Project Cost: 230 million PKR
- Consultancy Budget: 6.66 million PKR
- Firm Type: Single Firm
Scope of Work
The project covers the planning, designing, and construction of a 5.5 km road, ensuring durability and long-term functionality. Key activities include:
- Feasibility Study (F): Evaluating the technical and economic viability of the road.
- Surveying (S): Conducting topographic, geotechnical, and environmental assessments.
- Designing (D): Developing structural and pavement designs for enhanced durability.
- Quality Assurance (Q): Implementing high construction standards, safety measures, and material testing.
- Construction Supervision (C): Monitoring progress, contractor performance, and compliance with project specifications.
Project Objectives
- Improve Road Connectivity: Establish a seamless travel route to Shangla Top, benefiting both locals and tourists.
- Enhance Tourism & Economic Development: Facilitate access to Malam Jabba and nearby attractions, boosting tourism.
- Reduce Travel Time & Costs: Provide a direct and efficient route, saving time and fuel costs.
- Increase Safety & Accessibility: Ensure safe passage through hilly terrains, especially during extreme weather.
- Ensure Long-Term Sustainability: Build a resilient road using modern engineering techniques.
Key Features of the Road Construction
- High-Quality Asphalt Pavement: Ensuring smooth and durable travel conditions.
- Proper Drainage System: Preventing flooding, landslides, and erosion.
- Protective Road Barriers & Signage: Enhancing safety for drivers and pedestrians.
- Eco-Friendly Construction Practices: Minimizing environmental impact while maintaining sustainability.
Project Challenges
Despite significant progress, the project faces several challenges:
- Difficult Terrain: Constructing roads in mountainous landscapes poses engineering challenges.
- Weather Conditions: Extreme weather in Swat’s high-altitude regions may impact construction timelines.
- Material Transportation Issues: Ensuring timely delivery of construction materials to remote areas.
- Landslides & Soil Erosion: Implementing stability measures to prevent road damage.
- Budget & Time Constraints: Managing resources effectively to complete the project within the given timeframe.
The Construction of Road from Balakot on Malam Jabba Road to Shangla Top is a transformational infrastructure project that will improve mobility, boost tourism, and enhance economic activity in Swat. Once completed, this 5.5 km road will provide a safer, faster, and more accessible route, contributing to the development and prosperity of the region.