Construction of RCC Bridge Over River Kunhar at Ghari Habibullah – Mansehra
The Construction of an RCC (Reinforced Cement Concrete) Bridge Over River Kunhar at Ghari Habibullah is a critical infrastructure project initiated by C&W (Communication & Works Department) in Mansehra. This 120-meter-long bridge with four spans and an approach road is designed to enhance connectivity, transportation efficiency, and regional economic activities.
Project Overview
- Project Location: Ghari Habibullah, Mansehra
- Executing Agency: C&W Department
- Project Start Date: May 21, 2021
- Current Status: In Progress
- Total Project Cost: 200 million PKR
- Consultancy Budget: 6.085 million PKR
- Firm Type: Single Firm
Scope of Work
This project involves designing, constructing, and supervising a modern RCC bridge to ensure long-term stability and safety. The major tasks include:
- Feasibility Study (F): Conducting economic and technical viability assessments for the bridge.
- Surveying (S): Performing hydrological, geological, and topographic studies to optimize construction.
- Designing (D): Developing a structural bridge design suitable for high-load capacity.
- Quality Assurance (Q): Implementing construction standards to ensure safety and durability.
- Construction Supervision (C): Overseeing on-site execution, progress monitoring, and contractor performance.
Project Objectives
- Improve Transportation Infrastructure: Provide a safe and efficient crossing over River Kunhar.
- Enhance Economic Growth: Support trade, agriculture, and tourism by improving accessibility.
- Ensure Structural Durability: Build a flood-resistant, earthquake-resistant bridge.
- Reduce Travel Time & Costs: Offer a direct and reliable transport link for commuters.
- Promote Long-Term Sustainability: Utilize modern engineering techniques for durability and low maintenance.
Key Features of the Bridge Construction
- 120m Total Length & 4 Spans: Designed to support heavy vehicular and pedestrian traffic.
- RCC Bridge Structure: Ensuring high strength, longevity, and resistance to environmental factors.
- Approach Road Development: Connecting the bridge to existing road networks for seamless travel.
- Flood & Seismic Resistance: Built to withstand river surges, heavy rainfall, and seismic activity.
- Enhanced Safety Features: Including guardrails, pedestrian walkways, and road lighting.
Project Challenges
Several challenges are being addressed to ensure successful completion:
- Geographical & Hydrological Challenges: The river’s varying water levels require careful engineering solutions.
- Weather Conditions: Extreme weather patterns, heavy rainfall, and potential flooding may impact construction timelines.
- Material Transportation Issues: Ensuring timely delivery of construction materials to the remote site.
- Regulatory Approvals & Compliance: Adhering to environmental and safety regulations.
- Budget & Time Management: Balancing cost-effectiveness while ensuring high-quality construction.
Conclusion
The Construction of an RCC Bridge Over River Kunhar at Ghari Habibullah is a strategic infrastructure project that will significantly improve connectivity, boost economic activities, and enhance regional transportation in Mansehra. Once completed, this 120-meter-long bridge with four spans will provide a safe, efficient, and durable transport link, ensuring smoother mobility for local communities and businesses.