gsk logo (1)

Construction of RCC Bridge over River Kunhar at Ghari Habibullah

Clients:
C&W
Scope of Services:
F, S, D,Q, C
Scope of work:
120m length bridge, 4 span & approach raod
Timeframe:
Inprogress
Location:
Mansehra

Construction of RCC Bridge Over River Kunhar at Ghari Habibullah – Mansehra

The Construction of an RCC (Reinforced Cement Concrete) Bridge Over River Kunhar at Ghari Habibullah is a critical infrastructure project initiated by C&W (Communication & Works Department) in Mansehra. This 120-meter-long bridge with four spans and an approach road is designed to enhance connectivity, transportation efficiency, and regional economic activities.

Project Overview

  • Project Location: Ghari Habibullah, Mansehra
  • Executing Agency: C&W Department
  • Project Start Date: May 21, 2021
  • Current Status: In Progress
  • Total Project Cost: 200 million PKR
  • Consultancy Budget: 6.085 million PKR
  • Firm Type: Single Firm

Scope of Work

This project involves designing, constructing, and supervising a modern RCC bridge to ensure long-term stability and safety. The major tasks include:

  • Feasibility Study (F): Conducting economic and technical viability assessments for the bridge.
  • Surveying (S): Performing hydrological, geological, and topographic studies to optimize construction.
  • Designing (D): Developing a structural bridge design suitable for high-load capacity.
  • Quality Assurance (Q): Implementing construction standards to ensure safety and durability.
  • Construction Supervision (C): Overseeing on-site execution, progress monitoring, and contractor performance.

Project Objectives

  • Improve Transportation Infrastructure: Provide a safe and efficient crossing over River Kunhar.
  • Enhance Economic Growth: Support trade, agriculture, and tourism by improving accessibility.
  • Ensure Structural Durability: Build a flood-resistant, earthquake-resistant bridge.
  • Reduce Travel Time & Costs: Offer a direct and reliable transport link for commuters.
  • Promote Long-Term Sustainability: Utilize modern engineering techniques for durability and low maintenance.

Key Features of the Bridge Construction

  • 120m Total Length & 4 Spans: Designed to support heavy vehicular and pedestrian traffic.
  • RCC Bridge Structure: Ensuring high strength, longevity, and resistance to environmental factors.
  • Approach Road Development: Connecting the bridge to existing road networks for seamless travel.
  • Flood & Seismic Resistance: Built to withstand river surges, heavy rainfall, and seismic activity.
  • Enhanced Safety Features: Including guardrails, pedestrian walkways, and road lighting.

Project Challenges

Several challenges are being addressed to ensure successful completion:

  • Geographical & Hydrological Challenges: The river’s varying water levels require careful engineering solutions.
  • Weather Conditions: Extreme weather patterns, heavy rainfall, and potential flooding may impact construction timelines.
  • Material Transportation Issues: Ensuring timely delivery of construction materials to the remote site.
  • Regulatory Approvals & Compliance: Adhering to environmental and safety regulations.
  • Budget & Time Management: Balancing cost-effectiveness while ensuring high-quality construction.

Conclusion

The Construction of an RCC Bridge Over River Kunhar at Ghari Habibullah is a strategic infrastructure project that will significantly improve connectivity, boost economic activities, and enhance regional transportation in Mansehra. Once completed, this 120-meter-long bridge with four spans will provide a safe, efficient, and durable transport link, ensuring smoother mobility for local communities and businesses.

Worker at conbuild

fantastic experience. They truly understood​

 our vision and turned our dream home into a reality. The attention to detail and dedication were The team and growth work.