Construction of RCC Bridge on River Panjokra at Timergara Bypass to Kandaro Munda Road Dir Lower

Clients:
C&W
Scope of Services:
F, S, D,Q, C
Scope of work:
Supervison of 300m length bridge, 10 span & intersection
Timeframe:
Inprogress
Location:
Dir Lower

Construction of RCC Bridge on River Panjokra at Timergara Bypass to Kandaro Munda Road – Dir Lower

The Construction of an RCC Bridge on River Panjokra at Timergara Bypass to Kandaro Munda Road is a significant infrastructure project aimed at improving regional connectivity, easing traffic congestion, and enhancing trade and mobility in Dir Lower. This project involves the supervision of a 300-meter-long bridge with 10 spans and an intersection, ensuring a strong and durable transport link for local and commercial use.

Project Overview

  • Project Location: Dir Lower
  • Executing Agency: C&W Department
  • Project Start Date: July 28, 2021
  • Current Status: In Progress
  • Total Project Cost: 15.3 million PKR
  • Consultancy Budget: 8.77 million PKR
  • Firm Type: Single Firm

Scope of Work

This project covers the design, review, and supervision of an RCC bridge with advanced engineering features. Key project tasks include:

  • Feasibility Study (F): Evaluating economic, technical, and environmental feasibility.
  • Surveying (S): Conducting geotechnical, hydrological, and topographic assessments.
  • Designing (D): Creating a structural bridge design suitable for high traffic loads.
  • Quality Assurance (Q): Ensuring compliance with national and international safety standards.
  • Construction Supervision (C): Overseeing site execution, material testing, and project timelines.

Project Objectives

  • Improve Regional Connectivity: Provide a strong and efficient transport link for daily commuters and businesses.
  • Enhance Traffic Flow: Reduce congestion and travel time on busy routes.
  • Ensure Structural Durability: Construct a flood-resistant and earthquake-resistant bridge.
  • Boost Economic Growth: Support trade, agriculture, and commerce by improving logistics.
  • Ensure Sustainable Infrastructure: Use modern engineering techniques for long-term durability.

Key Features of the Bridge Construction

  • 300m Total Length with 10 Spans: Designed for heavy vehicle load-bearing and durability.
  • Reinforced Cement Concrete (RCC) Structure: Ensuring high strength and long-lasting performance.
  • Intersection Development: Efficient road connections for smooth traffic flow.
  • Flood & Seismic Protection Measures: Built to withstand river surges, heavy rainfall, and seismic activity.
  • Enhanced Safety Features: Incorporating guardrails, pedestrian walkways, and lighting for security.

Project Challenges

The construction process faces several challenges, including:

  • Challenging Terrain: Navigating river crossings and hilly landscapes for stable foundation development.
  • Weather Conditions: Heavy rainfall and potential flooding may impact construction schedules.
  • Material Transportation: Managing the timely supply of construction materials to remote areas.
  • Hydrological Risks: Addressing erosion and water flow changes to protect the bridge’s stability.
  • Budget & Time Constraints: Balancing cost-effectiveness with high construction quality.

Conclusion

The Construction of the RCC Bridge on River Panjokra at Timergara Bypass to Kandaro Munda Road is a transformational infrastructure project that will enhance transportation efficiency, support economic growth, and improve regional connectivity in Dir Lower. Once completed, this 300-meter-long bridge with 10 spans and an intersection will provide a safe, reliable, and sustainable transport route, benefiting local communities, businesses, and travelers for years to come.

Worker at conbuild

fantastic experience. They truly understood​

 our vision and turned our dream home into a reality. The attention to detail and dedication were The team and growth work.