Construction of Pre-Stressed Bridge at Shuwal – Balakot
The Construction of the Pre-Stressed Bridge at Shuwal is a major infrastructure project undertaken by C&W (Communication & Works Department) to improve connectivity and transportation in Balakot. This 120-meter-long bridge with four spans and an approach road will serve as a critical link for residents, businesses, and travelers, enhancing the region’s road network.
Project Overview
- Project Location: Shuwal, Balakot
- Executing Agency: C&W Department
- Project Start Date: November 5, 2021
- Current Status: In Progress
- Total Project Cost: 120 million PKR
- Consultancy Budget: 5.330 million PKR
- Firm Type: Single Firm
Scope of Work
The project involves the planning, design, and construction of a modern pre-stressed bridge with an integrated approach road. The key tasks include:
- Feasibility Study (F): Conducting technical and financial assessments for bridge viability.
- Surveying (S): Performing geotechnical, hydrological, and topographic surveys.
- Designing (D): Developing a pre-stressed concrete bridge design for structural stability.
- Quality Assurance (Q): Ensuring compliance with safety, durability, and engineering standards.
- Construction Supervision (C): Overseeing on-site execution, contractor performance, and adherence to timelines.
Project Objectives
- Improve Road Connectivity: Provide a safe and reliable transport route for locals and commercial traffic.
- Enhance Structural Durability: Construct a flood-resistant and earthquake-resistant bridge.
- Boost Economic Growth: Facilitate trade, tourism, and business activities in Balakot.
- Ensure Long-Term Infrastructure Development: Build a sustainable and low-maintenance bridge.
- Increase Road Safety: Incorporate modern safety features for vehicles and pedestrians.
Key Features of the Bridge Construction
- 120m Total Length & 4 Spans: Engineered for load-bearing efficiency and durability.
- Pre-Stressed Concrete Structure: Designed to withstand high traffic loads and environmental stresses.
- Approach Road Development: Ensuring smooth connectivity to existing road networks.
- Flood & Seismic Resistance: Built with elevated design and reinforced materials.
- Enhanced Safety Features: Including guardrails, pedestrian pathways, and road lighting.
Project Challenges
Several challenges are anticipated during the construction phase:
- Difficult Terrain: The hilly landscape and river crossings require specialized engineering solutions.
- Extreme Weather Conditions: Heavy rainfall, floods, and seasonal changes may impact construction.
- Material Transportation Issues: Delivering construction materials to remote areas is logistically challenging.
- Hydrological Risks: Assessing water flow variations to prevent structural erosion.
- Budget & Timeline Constraints: Balancing cost-efficiency while ensuring timely completion.
Conclusion
The Construction of the Pre-Stressed Bridge at Shuwal is a strategic infrastructure project that will significantly enhance connectivity, improve transportation efficiency, and support economic activities in Balakot. Once completed, this 120-meter-long bridge with four spans will serve as a vital link for regional mobility, ensuring safer and more reliable travel for the local population and visitors.