Project Details

  • Client: Communication & Works (C&W), Peshawar
  • Project Start Date: February 21, 2020
  • Project Completion Date: December 31, 2022
  • Total Project Cost: 50 million PKR
  • Bid Amount: 1.877 million PKR
  • Scope of Work: Foundation, Superstructure, Drainage, Quality Control, Concrete Works (F, S, D, Q, C)
  • Contractor Type: Single Firm
  • Bridge Specifications:
    • Length: 20 meters
    • Type: Reinforced Concrete Slab Bridge
    • Load Capacity: Designed to accommodate heavy vehicular and pedestrian traffic
    • Materials Used: High-strength concrete, reinforced steel, and corrosion-resistant reinforcements

Project Overview

The GM Bridge project in Peshawar was undertaken to enhance transportation connectivity, reduce congestion, and facilitate the smooth movement of traffic and goods. The bridge serves as a vital link, improving regional infrastructure and accessibility.

The bridge was designed as a 20-meter-long reinforced concrete slab bridge, ensuring durability and sustainability. Advanced engineering techniques were utilized to ensure a strong foundation, capable of withstanding environmental and load stresses.


Key Challenges in Construction

1. Geological and Soil Conditions

  • The site had weak soil conditions, requiring extensive ground improvement techniques such as soil compaction and piling.
  • Water table fluctuations posed additional challenges for foundation stability.

2. Weather and Environmental Factors

  • Peshawar experiences extreme seasonal temperature variations, which impacted concrete curing times and required adjustments in construction schedules.
  • Unexpected monsoon rains led to site flooding, causing work delays and requiring additional drainage measures.

3. Structural and Engineering Challenges

  • Ensuring proper load distribution across the slab bridge was crucial to prevent structural weaknesses.
  • Achieving the required reinforcement precision for slab strength demanded advanced construction techniques.

4. Logistical and Material Supply Issues

  • The COVID-19 pandemic during the early phase of the project caused supply chain disruptions, leading to shortages in cement, steel, and other materials.
  • Transporting heavy construction materials to the site required coordination with local authorities to minimize traffic disruptions.

5. Compliance with Safety and Regulatory Standards

  • Strict adherence to C&W and national engineering codes was required, leading to frequent quality control inspections.
  • Safety measures had to be enforced for workers, particularly while dealing with high-risk operations such as foundation excavation and concrete pouring.

6. Traffic Management and Public Coordination

  • The construction site was located in a busy urban area, requiring an effective traffic diversion plan to avoid major congestion.
  • Community engagement was necessary to address concerns of local businesses and residents affected by the construction.

Project Outcomes and Benefits

  • Enhanced Connectivity: The bridge provides a seamless connection between key areas, reducing travel time.
  • Increased Load Capacity: The structure is capable of handling heavy vehicles, essential for commercial transportation.
  • Improved Drainage System: Proper water management solutions were incorporated to prevent flooding issues.
  • Long-Term Durability: The use of high-quality concrete and reinforcements ensures longevity with minimal maintenance.
  • Economic Growth: The improved infrastructure supports local businesses and economic activities by facilitating smoother trade routes.

Conclusion

Despite numerous challenges, the GM Bridge, Peshawar, was successfully completed within the allotted budget and timeframe. The bridge now serves as a key infrastructure element, significantly benefiting transportation and economic development in the region. The project’s success demonstrates the importance of strategic planning, engineering expertise, and adaptive problem-solving in overcoming construction challenges.