gsk logo (1)

Construction of BTR Sharkhawe Dara & Alwara Mela Road

Clients:
C&W
Scope of Services:
F, S, D,Q, C
Scope of work:
Construction of 03km road
Timeframe:
Inprogress
Location:
Lower Kurram

Construction of BTR Sharkhawe Dara & Alwara Mela Road – Lower Kurram

The Construction of BTR Sharkhawe Dara & Alwara Mela Road is a crucial infrastructure project aimed at enhancing connectivity and transportation in Lower Kurram. This 3 km road construction project, undertaken by C&W (Communication & Works Department), will significantly improve accessibility for local communities, facilitate trade, and promote economic growth in the region.

Project Overview

  • Project Location: Lower Kurram
  • Executing Agency: C&W Department
  • Project Start Date: June 20, 2022
  • Current Status: In Progress
  • Total Project Cost: 226.042 million PKR
  • Consultancy Budget: 7.88 million PKR
  • Firm Type: Single Firm

Scope of Work

The project covers the planning, design, and construction of a 3 km road, ensuring quality and sustainability. The major tasks include:

  • Feasibility Study (F): Assessing the economic and technical viability of the road construction.
  • Surveying (S): Conducting topographic and soil investigations for optimal road alignment.
  • Designing (D): Preparing structural and pavement design to withstand traffic loads and environmental conditions.
  • Quality Assurance (Q): Implementing high construction standards and safety measures.
  • Construction Supervision (C): Overseeing on-site execution, contractor performance, and project timelines.

Project Objectives

  • Improve Transportation Infrastructure: Provide a smooth and durable road network for local and commercial use.
  • Enhance Accessibility: Connect remote areas with main highways to facilitate movement.
  • Boost Economic Development: Enable trade, agriculture, and business activities by improving logistics.
  • Reduce Travel Time: Shorten distances between villages and urban centers.
  • Ensure Long-Term Sustainability: Build a resilient road using modern engineering techniques.

Key Features of the Road Construction

  • Asphalt-Paved Surface: Ensuring durability and a smooth driving experience.
  • Drainage & Water Management: Preventing flood damage and road erosion.
  • Safety Enhancements: Including road markings, signs, and protective barriers.
  • Eco-Friendly Design: Implementing sustainable construction practices.

Project Challenges

The project faces several challenges, including:

  • Challenging Terrain: Navigating mountainous and uneven landscapes.
  • Weather Conditions: Adverse weather may delay construction progress.
  • Material Transportation: Ensuring a steady supply of construction materials to the site.
  • Security Concerns: Working in a region that may have logistical and security constraints.
  • Budget & Resource Management: Maintaining cost-efficiency while ensuring high-quality construction.

Conclusion

The Construction of BTR Sharkhawe Dara & Alwara Mela Road is a significant step toward developing infrastructure in Lower Kurram. Once completed, this 3 km road will enhance mobility, facilitate economic opportunities, and improve the quality of life for the local population, contributing to the overall growth and connectivity of the region.

Worker at conbuild

fantastic experience. They truly understood​

 our vision and turned our dream home into a reality. The attention to detail and dedication were The team and growth work.