Construction of BTR Sharkhawe Dara & Alwara Mela Road – Lower Kurram
The Construction of BTR Sharkhawe Dara & Alwara Mela Road is a crucial infrastructure project aimed at enhancing connectivity and transportation in Lower Kurram. This 3 km road construction project, undertaken by C&W (Communication & Works Department), will significantly improve accessibility for local communities, facilitate trade, and promote economic growth in the region.
Project Overview
- Project Location: Lower Kurram
- Executing Agency: C&W Department
- Project Start Date: June 20, 2022
- Current Status: In Progress
- Total Project Cost: 226.042 million PKR
- Consultancy Budget: 7.88 million PKR
- Firm Type: Single Firm
Scope of Work
The project covers the planning, design, and construction of a 3 km road, ensuring quality and sustainability. The major tasks include:
- Feasibility Study (F): Assessing the economic and technical viability of the road construction.
- Surveying (S): Conducting topographic and soil investigations for optimal road alignment.
- Designing (D): Preparing structural and pavement design to withstand traffic loads and environmental conditions.
- Quality Assurance (Q): Implementing high construction standards and safety measures.
- Construction Supervision (C): Overseeing on-site execution, contractor performance, and project timelines.
Project Objectives
- Improve Transportation Infrastructure: Provide a smooth and durable road network for local and commercial use.
- Enhance Accessibility: Connect remote areas with main highways to facilitate movement.
- Boost Economic Development: Enable trade, agriculture, and business activities by improving logistics.
- Reduce Travel Time: Shorten distances between villages and urban centers.
- Ensure Long-Term Sustainability: Build a resilient road using modern engineering techniques.
Key Features of the Road Construction
- Asphalt-Paved Surface: Ensuring durability and a smooth driving experience.
- Drainage & Water Management: Preventing flood damage and road erosion.
- Safety Enhancements: Including road markings, signs, and protective barriers.
- Eco-Friendly Design: Implementing sustainable construction practices.
Project Challenges
The project faces several challenges, including:
- Challenging Terrain: Navigating mountainous and uneven landscapes.
- Weather Conditions: Adverse weather may delay construction progress.
- Material Transportation: Ensuring a steady supply of construction materials to the site.
- Security Concerns: Working in a region that may have logistical and security constraints.
- Budget & Resource Management: Maintaining cost-efficiency while ensuring high-quality construction.
Conclusion
The Construction of BTR Sharkhawe Dara & Alwara Mela Road is a significant step toward developing infrastructure in Lower Kurram. Once completed, this 3 km road will enhance mobility, facilitate economic opportunities, and improve the quality of life for the local population, contributing to the overall growth and connectivity of the region.