gsk logo (1)

Bridge on River Panjkora at Timergara Bypass

Clients:
C&W
Scope of Services:
F, S, D,Q, C
Scope of work:
Design of 300m length bridge, 10 span & intersection
Timeframe:
Completed
Location:
DIR Lower

Design of Bridge on River Panjkora at Timergara Bypass – Dir Lower

The Bridge on River Panjkora at Timergara Bypass is a key infrastructure project initiated by C&W (Communication & Works Department) to enhance regional connectivity and traffic flow in Dir Lower. This project focuses on the design of a 300-meter-long bridge with 10 spans and an intersection, ensuring a safe, durable, and efficient crossing over the Panjkora River.

Project Overview

  • Project Location: Dir Lower
  • Executing Agency: C&W Department
  • Project Start Date: April 27, 2020
  • Completion Date: June 30, 2020
  • Total Project Cost: 600 million PKR
  • Consultancy Budget: 1.178 million PKR
  • Firm Type: Single Firm

Scope of Work

The project includes comprehensive bridge design services, focusing on structural integrity, sustainability, and modern engineering solutions. The key tasks involved are:

  • Feasibility Study (F): Evaluating technical, financial, and environmental factors.
  • Surveying (S): Conducting geotechnical and hydrological assessments to ensure stability.
  • Designing (D): Developing a structural and functional bridge design for high-load capacity.
  • Quality Assurance (Q): Implementing safety, durability, and material quality standards.
  • Construction Planning (C): Providing detailed plans for future execution and construction phases.

Project Objectives

  • Improve Transportation Infrastructure: Establish a reliable crossing over the Panjkora River.
  • Enhance Traffic Flow & Safety: Reduce travel time and congestion at Timergara Bypass.
  • Support Economic Growth: Facilitate trade, agriculture, and business transportation.
  • Ensure Structural Durability: Design a flood-resistant and earthquake-resistant bridge.
  • Promote Long-Term Sustainability: Use modern construction materials and eco-friendly solutions.

Key Features of the Bridge Design

  • 300m Total Length & 10 Spans: Engineered for high load-bearing capacity.
  • Reinforced Concrete Structure: Providing strength, durability, and weather resistance.
  • Intersection Development: Ensuring smooth traffic flow and easy access to major roads.
  • Flood & Seismic Resistance: Designed to withstand seasonal water surges and seismic activity.
  • Safety Enhancements: Including guardrails, pedestrian walkways, and night lighting.

Project Challenges

The project design faced several challenges, including:

  • Complex Terrain & Hydrological Factors: The river’s depth and flow variations required specialized engineering solutions.
  • Environmental Considerations: Ensuring minimal ecological impact on the river and surrounding areas.
  • Regulatory Approvals & Compliance: Adhering to government construction and safety regulations.
  • Budget & Resource Management: Designing a cost-effective yet high-quality bridge structure.
  • Future Expansion Needs: Planning for potential traffic increases and additional infrastructure integration.

Conclusion

The Design of the Bridge on River Panjkora at Timergara Bypass is a strategic infrastructure development project that will significantly enhance connectivity, improve traffic efficiency, and support economic activities in Dir Lower. Once constructed, this 300-meter-long bridge with 10 spans and an intersection will serve as a vital transportation link, ensuring safe, efficient, and sustainable mobility for the region.

Worker at conbuild

fantastic experience. They truly understood​

 our vision and turned our dream home into a reality. The attention to detail and dedication were The team and growth work.